1586 Hours total
New cylinder block and power head installed May 2021. 115 Hours on new head including break in.
New lower unit installed September 2020.
Come with all gauges and rigging
Starts and runs good
Shaft Length – 25” long
Exhaust has not been replaced
Palletized and ready for...
Its my understanding the amp rating of the circuit breakers on the switch panel are 10 amps. I just installed a new Johnson wash down pump and when not in use the pressure is building up to 10 amps (per rating of pump) and kicking the breaker on the switch panel. Anyone know if parker makes a...